Design and build
Configuration, integration and data migration are designed and built in sprints. The Design Authority rules on design, and the hazard log and test evidence grow.
Why it matters
Building in sprints with users shows problems months before go-live.
- PRINCE2
- Controlling a stage and Managing product delivery, one stage or more
- ITIL
- Design and transition; obtain/build; service validation and testing
- Ends at gate
- G2 Test exit and ready to prepare
Draws on
The rest of this page is for subscribers
Subscribe to read the other 4 sections of this page:
- How to run it
- Rules
- In the DelPulse workspace
- If you use Jira or Azure DevOps